AsBuiltReview

Choosing distributed control points for a fit review

Identify candidate control points

Open the survey and permit layers side by side. Select at least four points that are visible in both datasets: property corners, monument caps, or building corners that were not moved during construction. Avoid manholes, catch basins, or any structure that may have been built off its permit location.

Distribute around the site

Choose points that form a rough rectangle enclosing the project area. For a 600 ft by 400 ft subdivision, pick: - CP-1: southwest property corner - CP-2: southeast property corner - CP-3: northeast property corner - CP-4: northwest property corner

If a corner is missing, substitute a nearby monument cap but keep the envelope shape.

Record coordinates and residuals

Create a control table:

Label Permit X Permit Y Survey X Survey Y
CP-1 742315.42 1208904.17 742315.38 1208904.12
CP-2 742915.42 1208904.17 742915.45 1208904.10
CP-3 742915.42 1209304.17 742915.40 1209304.22
CP-4 742315.42 1209304.17 742315.35 1209304.18

Run the fit. Note the reported rotation, scale, and RMS residual. If RMS exceeds 0.05 ft, re-examine each point for mis-identification.

Exception: linear projects

For a sewer main running 2,000 ft along a road with no perpendicular control, use the two endpoint monuments plus two intermediate monuments (quarter and three-quarter points). The envelope becomes a long corridor; the fit will still solve rotation and scale but translation along the corridor is weaker — note this limitation in the reviewer comments.

Outcome

A documented control set with measured residuals supports the transform parameters used for every subsequent structure offset and pipe length comparison.

Related: AsBuiltReview features.