Survey review guides
These field guides explain practical ways to compare permit drawings with as-built survey data, document discrepancies, and preserve a traceable review record. Each guide focuses on one task in the first-pass review and handoff workflow.
- How to investigate an unmatched manhole in a survey submittal
- Survey Point IDs vs. Structure Names: A Review Guide
- Creating a permit to survey structure crosswalk
- Reviewing reused identifiers across drawing sheets
- Matching a pipe when one endpoint name changed
- Recording a missing invert without assuming zero
- Separating retired structures from missing field observations
- Flagging a duplicate structure tag
- Checking horizontal datum metadata before alignment
- Documenting assumed units in a survey export
- Choosing distributed control points for a fit review
- Explaining control residuals in reviewer notes
- Investigating a scale discrepancy before comparing distances
- Checking a mirrored drawing before accepting a transform
- Recording what changed between two survey alignments
- Reviewing a pipe slope when the run direction reverses
- Checking whether length is measured along plan or slope
- Distinguishing rim elevation from invert elevation
- Reviewing a survey with multiple inverts at one structure
- Identifying ambiguous pipe connections at a junction
- Tracing one outlier without discarding the rest of a network
- How to note a missing upstream elevation in a review log
- Checking a DXF layer map before matching structures
- Preparing a LandXML export handoff for review
- Making a CSV coordinate header unambiguous
- Handling blank coordinate cells in a review copy
- Documenting repeated survey shots at the same point
- Preserving original units when making a review spreadsheet
- Separating survey comments from numeric columns
- Recording the governing specification revision
- Linking a finding to a project-specific criterion
- Separating a screening flag from an engineering decision
- Requesting the governing tolerance when none was supplied
- Making reviewer overrides traceable
- Documenting exclusions from a first-pass review
- Carrying a superseded specification into the audit trail
- Numbering redlines so spreadsheet rows stay connected
- Writing a redline that identifies the affected run
- Separating drawing corrections from field verification requests
- Preventing comments from disappearing on revised sheets
- Comparing two versions of a redline log
- Preparing a reviewer handoff when the author is absent
- Labeling unresolved findings for the next submittal
- Building a resubmittal checklist from open comments
- Matching contractor responses to review identifiers
- Verifying that a corrected point reached the export
- Tracking a reopened comment after another survey update
- Distinguishing accepted deviations from corrected geometry
- Packaging source files with a review report
- Closing a review without treating unchecked items as passing