Packaging source files with a review report
What the package holds
A review package is the permit drawing, the survey, the specification sets you applied, the review output, and the redline sheet, kept together so another person can retrace the same decisions. The review itself is a first-pass check: it aligns the permit drawing to the survey, matches structures by name, runs the arithmetic on offsets, elevations, lengths, slopes and cover, and shows each step so you can confirm a finding before you act on it. Package the evidence of those steps, not only the final sheet.
Fit and control records
Before comparing structures, record how the permit drawing was placed onto the survey. Note the rotation, scale and the fit error on the control points, and state which property corners or monuments controlled the fit. If a structure was clearly built out of place and set aside, list it by name and say why it was excluded, so the next reviewer sees that it did not pull the fit off. A one-line entry such as "fit on PC-1, PC-2 and MH-7; fit error 0.12 ft; sump S-3 set aside, built 18 ft east of alignment" is enough to check later.
Rule library and citation trail
Keep specifications in one library filed State, County, City, then Utility or private entity, for example North Carolina, Buncombe County, MSD. Choose the sets that apply to the project. Each rule you apply should carry its limit, warning value, document name and section, and every finding should cite that document and section. Replace the common starter checks and placeholder numbers with your own before you rely on them.
Illustrative package for a small subdivision: permit DWG S-104, survey dated 04/12, rules from MSD standard detail 3.2 with a 10 ft warning and 12 ft limit on minimum cover. The review output shows MH-4 matched to SSMH #4, horizontal offset 0.8 ft, invert difference -0.15 ft, cover finding 11.4 ft cited to detail 3.2. The redline PDF carries the 24x36 sheet, revision clouds, numbered balloons and comment boxes with the same citations. Check that the balloon number, the comment box citation and the library entry name match; if one says detail 3.2 and another says section 3.2.1, fix the label before release. The package folder ends with one named rule set, one fit note, one findings list and one redline sheet whose citations agree.