Reviewing a pipe slope when the run direction reverses

When a pipe run reverses direction between two structures, slope is still rise over run, but the sign convention has to be stated or the number is meaningless. Decide once, write it on the comparison sheet, and apply it to every pipe in the run. The usual choice is positive slope when the pipe falls in the direction of flow, with flow direction taken from the invert elevations rather than from drawing order.

Establish which end is upstream

Compare the two invert elevations. The lower invert is downstream. If the permit drawing shows the pipe flowing the other way, that is a finding in itself and should be noted before any slope arithmetic. Do not let the drawing order decide; let the elevations decide, and record the reasoning in one line.

Compute the slope and show the run

Slope equals invert difference divided by horizontal pipe length. For a reversed run, the invert difference is taken as downstream minus upstream, which will be negative if the pipe rises. Show the run length used and whether it came from plan length or from a surveyed 3D length.

A fictional example:

  • Pipe from SSMH-2 to MH-5. SSMH-2 invert 92.40; MH-5 invert 92.10. Plan length 120.0.
  • Downstream is MH-5. Drop is 0.30 over 120.0, slope 0.0025 falling, written +0.25 percent.
  • Permit shows the pipe flowing from MH-5 to SSMH-2. The comparison sheet flags "flow direction reversed against permit" and keeps the computed slope as +0.25 percent.

Handle a flat or rising segment

A segment that is flat within the stated tolerance should be recorded as flat, not as a tiny fall. A segment that rises is recorded with a negative slope and a note. Whether a rise is acceptable depends on the approved design and the reviewing authority; the sheet records it, it does not decide it.

Offline recordkeeping: the slope column carries a sign and a stated flow direction, so a reversed run no longer reads as a different pipe.