Tracking a reopened comment after another survey update

Reopening a finding when a new survey changes a previously closed item

A finding marked Verified in cycle three can reopen in cycle four if the latest survey shows the structure moved again. The reviewer creates a new Finding ID with the current cycle code but adds a suffix “-R” to signal reopen. Example: PP-02-RC-03-12 becomes PP-02-RC-04-12-R. The original ID stays in the log with status “Closed RC-03.”

Carrying forward the rule citation and balloon

Copy the exact rule citation and balloon number from the closed finding into the new row. This keeps the regulatory reference intact and lets the contractor see the same balloon on the updated redline.

Worked example: MH-12 offset returns

Cycle three: MH-12 offset 0.01 ft, verified closed. Cycle four survey shows MH-12 offset 0.38 ft. Reviewer opens new row PP-02-RC-04-12-R, citation NC-BUN-MSD §4.2.1, balloon 12. Checklist now shows:

Finding ID Status Cycle
PP-02-RC-03-12 Verified RC-03
PP-02-RC-04-12-R Open RC-04

The contractor’s next response must address the -R row. The reviewer compares the cycle three and cycle four coordinates side by side to confirm the structure actually moved.

Exception: reopen caused by survey control shift

If the new survey’s transform fit error jumped from 0.03 ft to 0.12 ft, the apparent movement may be a datum shift. The reviewer notes “Possible control shift; verify monuments” in the log and requests the surveyor’s control report before demanding a contractor correction.

The reopened finding now tracks separately from its history while preserving the full audit trail.