Building a resubmittal checklist from open comments

A resubmittal checklist turns open review issues into a project-controlled handoff that preserves the fields needed for follow-up and verification. It is a manual project document, not a sheet that AsBuiltReview sends to a contractor.

Start with the exported Review Log

The Review Log exports these columns: Issue, Status, Feature, Check, Found, Allowed, Spec, Document, Section, Citation text, Review status, and Reviewer note. Filter on Review status rather than Status: Status reports the generated check result, while Review status records the reviewer’s Open, Accepted, Resolved, or Waived disposition.

Finding ID, Contractor Response, Verified, owner, due date, and a cross-cycle identifier are not current Review Log column names. Add any of them to the separate checklist only when the project team needs them, and label them as project-controlled fields.

Choose the handoff fields

  1. Keep the exported Issue, Feature, Check, Found, Allowed, citation fields, Review status, and Reviewer note needed to understand each open item.
  2. Add a stable project-controlled ID when the item must be followed across review cycles.
  3. Add an owner and next action so responsibility is explicit. Add a due date only when the project’s process supplies one.
  4. Give the checklist to the appropriate project participant through the team’s normal submittal process. AsBuiltReview does not send it.
  5. Record verification evidence after a reviewer examines the next submittal; do not treat a response or revised label as proof by itself.

Copyable fictional example

Fictional placeholder row for a project-controlled resubmittal checklist
Project IDIssueFeature / checkFound / allowedProject citationReview status / noteOwner / next actionContractor responseVerification evidence
[project carry-forward ID][app issue #][asset] / [check][measured value] / [required value][project citation]Open / [reviewer note][owner] / [next action][project team entry][evidence reviewed and result]

This placeholder preserves the measured value, required value, and governing project citation without inventing a standard, tolerance, RFI, contractor response, or corrected result.

For items that span review cycles, label unresolved findings for the next submittal. When the source files and project rules are ready, run the first-pass review.