Labeling unresolved findings for the next submittal
Carry an unresolved finding forward with a stable project-controlled ID, the AsBuiltReview issue number, asset and sheet, measured and allowed values, project-specific citation, review status and note, owner, next action, and verification evidence. This keeps the next review cycle traceable without treating an open item as corrected.
What AsBuiltReview records
AsBuiltReview numbers issues within each generated review. For every non-passing issue, a reviewer can save an Open, Accepted, Resolved, or Waived review status and a reviewer note; those values persist with the review and appear in the Excel Review Log.
The app does not create a project’s cross-submittal carry-forward code, edit the contractor’s next plan sheet, or prove that a correction was made. Its issue number identifies an item inside the generated review, so the project team must control any identifier intended to remain stable across later submittals.
Manual handoff method
- Download the Review log (Excel) and filter Review status to Open.
- In a separate project-controlled register, assign a stable carry-forward ID and copy the app issue number, feature, measured value, allowed value, citation, review status, and reviewer note.
- Add the sheet, owner, next action, and the evidence the reviewer must inspect in the next submittal.
- Place the project-controlled ID on the team’s markup or transmittal using the project’s normal document process. Do not describe that manual identifier as an editable AsBuiltReview redline comment.
- On the next cycle, compare the cited evidence and record the reviewer’s disposition. A missing balloon or changed sheet does not by itself verify a correction.
Copyable carry-forward register
| Carry-forward ID | App issue # | Asset / sheet | Found / allowed | Project citation | Review status / note | Owner / next action | Verification evidence |
|---|---|---|---|---|---|---|---|
| [project carry-forward ID] | [app issue #] | [asset] / [sheet] | [measured value] / [required value] | [project citation] | Open / [reviewer note] | [owner] / [next action] | [revised sheet, survey observation, or other project evidence to inspect] |
Keep the measured comparison and citation when a reviewer later changes the status. The status explains the disposition; it does not replace the evidence behind the original finding.
Next, turn the open findings into a resubmittal checklist. Review the AsBuiltReview features, or start a first-pass review.